Fit-out BOQ: how to read a bill of quantities and set your budget
How to read a fit-out BOQ line by line, how it differs from a quotation, and how to compare two before you sign: allowances, exclusions, units and permits.
By Ali Haider Basra, Founder, Al Tareeq Decor · Contact our workshop

Key takeaways
- A BOQ lists every item with its location, quantity, unit and amount; a lump sum shows only the total.
- Read one line fully, from reference to amount, and you can check the rest: quantities and units cause most errors.
- Ask who owns each allowance, provisional sum and exclusion before signing, and write the answer next to the BOQ.
- Put approval fees in the budget as their own line; the customer arranges approvals, and our programme starts once they are granted.
- Joinery and fit-out is quoted as a BOQ after a site visit and measured drawings, so there is no starting price to quote.
On this page
- Key takeaways
- What a BOQ is, in plain words
- BOQ, quotation or lump sum: which one are you holding?
- Three ways a fit-out price can arrive
- Reading one BOQ line, column by column
- The sections a home fit-out BOQ usually has
- Typical sections of a home fit-out BOQ
- Quantities you can check yourself
- Allowances, provisional sums and exclusions
- Costs that hide between the lines
- Permits and approvals belong in the budget too
- Setting a budget before the BOQ exists
- Comparing two BOQs in an evening
- Changes, programme and handover
- Common questions
What a BOQ is, in plain words
BOQ stands for bill of quantities: a list of every piece of work in a project, with how much of it there is. Quantity surveyors prepare them from the drawings and the specification, and the Designing Buildings wiki describes the result as a document that lists the measured quantities of the items shown there. On a villa or apartment fit-out it is the page that turns a design into numbers you can check.
What makes a BOQ different from a price on a WhatsApp message is that the quantities are fixed and visible. Whoever prices the work is pricing the same ceiling area, the same number of doors and the same metres of skirting, instead of measuring and guessing for themselves. That is what lets you put two prices side by side and see where they really differ.
Al Tareeq Decor quotes joinery and fit-out this way, after a site visit and measured drawings. There is no starting price for it on our site, because there is no standard room: the BOQ for your rooms is the price.
BOQ, quotation or lump sum: which one are you holding?
People search for "fit out quotation" and "BOQ for interior fit out" as if they were one thing. They are three different documents, and mixing them up is how two prices for "the same job" end up far apart with nobody able to say why.
A lump sum gives one figure for a described result. It is quick and easy to read, but nothing inside it can be checked, so any change turns into an argument about what was included. A BOQ breaks the same figure into lines. An allowance-based quotation sits between them: it fixes most of the work and leaves a few items, a stone top or a chandelier, as a sum to be spent on something not chosen yet.
For a home with joinery, ceilings and finishes in the same project, ask for the BOQ form. The extra pages cost nothing, and they make every later change quick to price.
Three ways a fit-out price can arrive
Lump sum
- What you see
- One total for a described result
- Good for
- A single, clearly defined item
- Watch for
- Nothing inside can be checked; changes cause arguments
BOQ
- What you see
- Every item with its location, quantity, unit and amount
- Good for
- Several trades in one project; comparing offers
- Watch for
- Quantities from a rough design are estimates, not final
Allowance-based
- What you see
- A BOQ in which some items are a fixed sum, not yet chosen
- Good for
- Choices still open, such as stone, fittings or fabrics
- Watch for
- The allowance silently becoming the price of whatever is picked
A bill priced from an incomplete design is usually called an approximate bill. The Designing Buildings wiki notes that it tends to bring more variations and less certainty on the final price.
Reading one BOQ line, column by column
Every BOQ is built from the same unit, the line. Learn to read one and you can read forty. The drawing below takes a single example line, a media wall in a living room, and shows what each column should say and what it lets you check. The numbers on it are an illustration of how a line is built, not a price list. For what a media wall actually includes, see what is a media wall.
The reference ties the line to a drawing, the location says which room and wall, and the description names the material, the finish and the hardware instead of a vague word such as "premium". The quantity and unit come next: a wall measuring 4.2 by 2.8 m has an area of 11.76 m², a figure you can confirm with a tape in a minute. Last come the rate and the amount, which must multiply out exactly.
If a line is missing one of these, ask for it. A line without a unit cannot be compared, and a line without a location cannot be inspected at handover.
- 1. Reference: the number of the drawing item it belongs to
- 2. Location: the room and the wall, so it can be inspected
- 3. Description: material, finish and hardware, named
- 4. Quantity: a measurement you can repeat with a tape
- 5. Unit: the same in every quotation you compare
- 6. Rate: stated as supplied and fitted, or labour only
- 7. Amount: rate times quantity; the amounts add up to the total
The sections a home fit-out BOQ usually has
Lines are grouped into sections, usually by trade, so the BOQ reads in the order a project is built. For a home the groups are fairly predictable, and the table shows each one with the unit its lines are normally measured in and the question worth asking about it.
If one of these sections is missing from your BOQ, that is not automatically a mistake: a curtain-only job has no ceiling section. But if your drawings show a lowered ceiling and the BOQ has no ceiling lines, someone has assumed that another party pays for it. The order in which the trades should work is covered in planning a fit-out; this guide only needs the list.
Typical sections of a home fit-out BOQ
Protection, access and cleaning
- Usual unit
- Lump sum or per room
- What to check on the lines
- Floor and furniture covers, daily clearing, final clean
Removal and making good
- Usual unit
- m², number or lump sum
- What to check on the lines
- Disposal included, and what condition the surface is left in
Gypsum ceilings and partitions
- Usual unit
- m² for flat areas, linear metres for coves
- What to check on the lines
- Board type, finish level, cut-outs and access panels
Electrical and lighting
- Usual unit
- Number of points, linear metres of LED
- What to check on the lines
- Who supplies fittings; what is a new circuit and what a moved point
Joinery: wardrobes, media wall, doors
- Usual unit
- m² of front, or a number of units
- What to check on the lines
- Board, finish, hinges and runners, interior fittings
Wall finishes: paint and wallpaper
- Usual unit
- m² of wall
- What to check on the lines
- Preparation, primer and number of coats, or the paper reference
Curtains and soft furnishings
- Usual unit
- Per window or per metre
- What to check on the lines
- Fabric reference, lining, track or rod, installation
Provisional sums and allowances
- Usual unit
- Fixed sum
- What to check on the lines
- What each one is for, and who chooses the item
Units as we use them when we draw up a BOQ; your own BOQ follows the work in your rooms.
Quantities you can check yourself
You do not need a quantity surveyor's training to find a wrong quantity. Wall finishes and joinery fronts are plain width times height. A room 5.0 m by 4.0 m has a floor area of 20 m², and its flat ceiling has the same 20 m² to price. Count the doors in the schedule and compare it with the doors you can see in the drawing, and count the light points the same way.
Two checks catch most errors. First, add up the rooms: if the BOQ gives 96 m² of ceiling for a flat you know has about 80 m² of floor, ask what accounts for the difference, since a cove or a bulkhead may add a little but not that much. Second, check the units: a price per square metre applied to a quantity in linear metres is the commonest slip, and it can throw a total far out.
When you find something, ask rather than accuse. Drawings change during a design, and the BOQ lags behind them. A good contractor will thank you for catching a line that would otherwise turn up as a variation in month two.

Allowances, provisional sums and exclusions
These three phrases decide more of the final bill than any rate. An allowance is money set aside for something that has not been chosen yet, such as a feature stone top or a chandelier. A provisional sum is the same idea for work that has not been defined, such as repairs that may turn up behind an old wall finish. An exclusion is anything the price simply does not cover.
Treat each one as a question with an owner. Who chooses the item, by what date, and what happens if the choice costs more? An allowance of AED 3,000 for a chandelier is fine if you pick a chandelier that costs AED 3,000. If you fall in love with one at AED 5,000, the BOQ should say that the difference is yours, so it does not come as a surprise at the end.
Exclusions deserve the same attention as inclusions. Common ones are curtains and loose furniture that someone else supplies, AC equipment, appliances, permit fees and the removal of what was already there. Write the list next to the BOQ and tick each item as either included, excluded, or someone else's job. Making that list before signing costs an hour, and skipping it can cost thousands.
Costs that hide between the lines
A BOQ lists the work you can see in the finished room, and some of the cost sits outside that picture: protecting floors and lifts, carrying material up, clearing rubbish, making good the edges where one trade meets another, and a final clean before handover. Some contractors price these as a line of their own, others spread them across the rates. Either is acceptable. What is not acceptable is that nobody has priced them.
Look especially for the places where two trades meet. The boundary between a gypsum ceiling and the painter, between a wardrobe and the skirting, between a media wall and the socket behind it. Each side may assume the other will make good, and the gap shows up at handover as a line nobody wants to own.
The video below, made for interior designers and project managers, walks through preparing a BOQ for an interior project step by step. Its examples are not from the UAE, so take the structure and ignore the figures: sections, items with quantities and units, rates, and a total.
Permits and approvals belong in the budget too
A budget should show what the building needs before work starts, not only what the contractor charges. Rules differ by emirate, by free zone and by building, and the BOQ for a villa in Sharjah does not need what an office in a Dubai tower does. The only safe approach is to ask the building management and the relevant authority what applies to your property, early.
As one published example, the Dubai Development Authority's fit-out permit lists the contractor as the applicant. It asks for the tenant's appointment letter for the contractor, a tenancy registration copy, an NOC from the building owner, further NOCs from the authorities concerned, and approved drawings. As we read the page on 28 October 2026, its fee was AED 0.90 per ft², with a minimum of AED 200 and a maximum of AED 10,000, plus two small digital charges of AED 10 each, and an approved permit stayed valid for six months. A Civil Defence completion certificate is needed before the fit-out completion certificate.
That is a Dubai authority's process for its own jurisdiction, and it is given only to show what such a permit involves. Where an approval is needed for your home, the customer arranges it, and our programme starts once it has been granted. Ask who submits it, what it costs, and how long it takes, and put the fee in your budget as its own line.
Setting a budget before the BOQ exists
You cannot get a BOQ without a design, and you cannot finish a design without some idea of the budget, so start with a number you can defend. Work room by room: list what is changing in each, such as a ceiling, a media wall, a wardrobe wall or a paint job, and give each a rough allowance using the guides that already price those items. Our media wall cost guide, wardrobe materials guide and gypsum ceiling specification are the places to start.
To give a sense of scale: the home projects Al Tareeq has described to us range from about AED 8,000 to AED 25,000. Each of those is a different agreed mix of work, not a package, so they show that a project can be small and well defined, not that a whole villa costs a given figure. Larger scopes, anything touching structure or services, get their own budget.
Keep a reserve of your own outside the BOQ. The more still unknown in the design, the larger it should be, because an approximate bill is exactly where variations come from. Our whole-home budget guide shows how room scopes and shared items fit into one total.
Comparing two BOQs in an evening
When two BOQs arrive, the totals are the least useful numbers on them. Put the documents side by side and work through the same five steps.
- Line up the sections so each trade can be compared with the same trade.
- Compare quantities first. If two contractors measured the same room differently, find out why before you look at any rate.
- Compare units next, then rates, and check that each rate says whether it includes materials and fitting or labour only.
- Read the descriptions for the board, finish, hardware and brand named. A cheaper line that names a thinner board is a different product.
- List the exclusions and allowances for each, and put a figure on whatever one has left out and the other has included.
Changes, programme and handover
Once the BOQ is agreed it becomes the yardstick for every change. The priced bill works as a schedule of rates, which is the reason a well-built one makes variations quick to value: a moved wall or an extra door is priced from lines that already exist. Agree each change, with its cost and its effect on the programme, before the work goes ahead, and ask for the revised BOQ line in writing.
Programme is a separate question from price. Some of our home projects take around 15 to 25 days, but the agreed scope, the materials, any approvals and the readiness of the site decide the actual figure, and we confirm it with the BOQ rather than before it. The one-room timings for our single products do not apply to a combined fit-out.
The BOQ is also your handover checklist. At the end you walk through it line by line, which is the method set out in the fit-out handover checklist. Our 24-month written workmanship warranty applies to new orders agreed from 10 October 2026; the terms are in the warranty and aftercare guide.
To get a BOQ for your own project, book a visit through joinery and fit-out or see our work in Sharjah. We measure on site, draw the rooms, and send the drawings and the itemised BOQ together.

Common questions
What is a BOQ in fit-out?
A bill of quantities: every item of work with its location, quantity, unit and amount, so a price can be checked and compared. Joinery and fit-out.
What is the difference between a BOQ and a quotation?
A quotation can be a single lump sum; a BOQ breaks the same total into measured lines. The BOQ is easier to compare and to change. Fit-out handover checklist.
How much does a villa or apartment fit-out cost in the UAE?
It depends on the scope; we have no standard price and quote joinery and fit-out as a BOQ after a visit. Our project examples run from about AED 8,000 to AED 25,000, each a different mix of work. Whole-home budget.
How long does a home fit-out take?
Some of our home projects take around 15 to 25 days; the agreed scope, approvals and site readiness decide it. Planning a fit-out.
Who gets the permit for a fit-out?
The customer arranges any approval the building or authority requires, and our programme starts once it is granted. Rules differ by emirate and building. Fit-out BOQ guide.
What should a BOQ exclude?
Whatever is someone else's job, usually appliances, AC equipment, permit fees or loose furniture. List exclusions in writing next to the BOQ. Gypsum ceiling specification.
Can I change the BOQ after I approve it?
Yes; agree the cost and the effect on timing before the extra work begins. Occupied-home preparation.
Sources & specifications
Manufacturer information applies to the named products and systems. Sources reviewed on 28 October 2026.
- Designing Buildings wiki: bill of quantities (contents, tender comparison, variations, approximate bills)designingbuildings.co.uk(opens in a new tab)
- Dubai Development Authority: fit-out permit (applicant, NOCs, fee, validity)dda.gov.ae(opens in a new tab)
- UAE government: consumer protection, invoices and supplier obligationsu.ae(opens in a new tab)
Want this planned for your home?
Consultation and measurement are free. Tell us the rooms, location and what you need; we arrange a sample visit and define the measured quotation.